Wuhan Industrial Park Wastewater Treatment Plant Upgrade and Renovation
—Project Background—
The on-site environment of the wastewater treatment plant in Wuhan Industrial Park is poor, with low automation level, and manual operations are time-consuming and labor-intensive;
Equipment operating parameters cannot be tracked and analyzed;
Unable to obtain timely information on operational faults and abnormal water quality;
The operation of water plants relies on experience and technology, which poses high risks.

—Project Focus—
The existing water treatment self-control system has been fully upgraded;
Eliminate and replace some old equipment, design automated linkage, intelligent serial connection system and equipment;
Automatic and precise dosing configuration, video surveillance.
—Project Effectiveness—
Real time monitoring of emission data, automatic alarm and correction of abnormalities in a timely manner;
Key area video surveillance management, abnormal situation recording and storage;
Real time monitoring of wastewater operating parameters and data analysis applications;
Realize automatic dispensing and automatic adjustment of dosage.
